2024 Nov 5 General
Ballot Issue 5B Thompson School District R2-J

Choices

Ballot Measure

Ballot Issue 5B [see summary of question below]
SHALL THOMPSON SCHOOL DISTRICT R2-J DEBT BE INCREASED $220 MILLION, WITH A REPAYMENT COST OF NOT TO EXCEED $395 MILLION, AND SHALL DISTRICT TAXES BE INCREASED NOT MORE THAN $32 MILLION ANNUALLY TO PAY SUCH DEBT, TO BE MONITORED BY A CITIZENS’ OVERSIGHT COMMITTEE, ALL FOR THE PURPOSE OF: CONSTRUCTING AND EQUIPPING CAREER AND TECHNICAL EDUCATION SPACES AND INNOVATION SPACE UPGRADES TO ALLOW FOR PROGRAM EXPANSION; EQUIPPING AND/OR FURNISHING SCHOOL BUILDINGS, INCLUDING, BUT NOT LIMITED TO, SCHOOL SAFETY AND SECURITY EQUIPMENT INCLUDING VESTIBULES, RADIO AMPLIFICATION SYSTEMS AND PHYSICAL SYSTEM UPGRADES; ADDRESSING DEFICIENCIES IN ENVIRONMENTAL CONDITIONS BY UPDATING AND/OR EQUIPPING VARIOUS DISTRICT FACILITIES WITH HEATING, VENTILATION, AIR CONDITIONING AND OTHER AIR QUALITY IMPROVEMENTS; PROVIDING PRIORITY MAINTENANCE UPDATES AT VARIOUS SCHOOL BUILDINGS THROUGHOUT THE DISTRICT; CONSTRUCTING, RENOVATING AND/OR UPGRADING VARIOUS DISTRICT FACILITIES TO ACCOMMODATE GROWTH NEEDS; AND FOR ACQUIRING, CONSTRUCTING OR IMPROVING ANY CAPITAL ASSETS THAT THE DISTRICT IS AUTHORIZED BY LAW TO OWN; AND SHALL THE MILL LEVY BE IMPOSED IN ANY YEAR WITHOUT LIMITATION AS TO RATE BUT ONLY IN AN AMOUNT SUFFICIENT TO PAY THE PRINCIPAL OF, PREMIUM, IF ANY, AND INTEREST ON SUCH DEBT OR ANY REFUNDING DEBT (OR TO CREATE A RESERVE FOR SUCH PAYMENT); SUCHDEBT TO BE EVIDENCED BY THE ISSUANCE OF GENERAL OBLIGATION BONDS TO BE SOLD IN ONE SERIES OR MORE, FOR A PRICE ABOVE OR BELOW THE PRINCIPAL AMOUNT OF SUCH SERIES, ON TERMS AND CONDITIONS AND WITH SUCH MATURITIES AS PERMITTED BY LAW, INCLUDING PROVISIONS FOR REDEMPTION OF THE BONDS PRIOR TO MATURITY WITH OR WITHOUT PAYMENT OF THE PREMIUM OF NOT TO EXCEED ONE PERCENT?

Official Sources

Download Data

Download the data from this ballot measure
Results CSV
Layout:
Table
List
Download